Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 23, 2022     45-7 Cabin Doors and Transparency Step Build Up Flanges - (16 hours)       Category: Fuselage
Building up flanges to allow proper compression of the McMaster seal. Right door required more work as i sanded too much when fitting the door. Used sacrificial McMaster seal filled with epoxy and flox to build up and provide adequate thickness for the seal to have a nice grip. Few round required for the right door. Left door looks better.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.